Call (310) 754-0898Book a consultation
Los Angeles ADU designers · plans & permits

Plans done fast. Permits approved. Build for less.

We are a design and permitting firm. We draw your ADU, pick the code route that gets you the most square footage, and carry the set through LADBS plan check.

150+ projects designedFast LADBS approvalsEnglish & Farsi
From our permitted sets1/6
Existing and proposed west elevations of a two-storey ADU over a garage in West Los Angeles
Addition + two-storey ADU · West LA 90064A second storey goes up over the existing garage. The footprint never changes.
Existing and proposed street elevations of a house addition in Long Beach
Addition + garage conversion · Long Beach 90807248 sf added to the house, drawn so the street face still reads as the original.
Proposed site plan of a house addition and two-storey ADU in West Los Angeles
Addition + two-storey ADU · West LA 90064How it all fits on a 45 × 130 lot, with setbacks and open space intact.
Existing and proposed floor plans of a house remodel and addition in Long Beach
Addition + garage conversion · Long Beach 90807Inside the house: what comes out, what goes in, and where the new suite lands.
Ground and second floor plans of a two-storey ADU above a garage
Addition + two-storey ADU · West LA 90064The ADU itself: living space below, two bedrooms and two baths above.
Proposed west and north elevations of a garage conversion and addition in Winnetka
Garage conversion + addition · Winnetka 91306Proposed elevations drawn to match the stucco and roofline already there.

New: as-built plans in as fast as 48 hours.

Get your as-built quote →
150+projects designed
5.0 ★client rating
LADBSplan check experts
English & Farsiconsultations
Expert strategy, not guesswork

Many incentives. One best route for your lot.

Several laws can get you to the same number of homes, but each one differs in cost, fees and timeline. Which one wins depends on your lot. That is the job.

1

We review your property

Lot size, zoning, the existing house and garage, and what you are after: rent, family space or resale.

2

We compare every route

Garage conversion, backyard ADU, JADU, attached bonus ADU, SB 9 and the 2027 rules, weighed on square footage, cost, fees and time.

3

We design and permit the winner

One clear recommendation, then plans engineered and taken through plan check to approval.

Easier than you think

More space and income, without a major remodel

Use what you already haveA garage conversion keeps the walls, roof and foundation. A JADU is built inside the house.
Your house stays livableWork stays in one small building or one part of the house. Nobody moves out.
Government bonusesNo parking in most cases, no impact fees on smaller units, 60-day approval deadline.
Value that lastsA legal unit you can rent, finance and sell with the property.
What we do

ADU design and permits

Garage conversions

An unused garage becomes a studio or one-bedroom rental. Usually the fastest, cheapest ADU.

Plans from $5,000

Detached ADUs

New backyard homes, one or two stories, or built over a garage.

Request a quote

Attached ADUs & JADUs

Including the bonus attached ADU that floor-area limits can't block.

Request a quote

Multiple ADUs

Two to eight ADUs on duplex and apartment lots.

Request a quote

SB 9: up to 4 homes

Two primary homes plus ADUs on a single-family lot.

How SB 9 works

As-built plans in 48 hours

Measured drawings for permits, legalization and listings. Corrections and expediting too.

From $1,500 · get a quote

Recent projects

What we've designed and permitted

Rendering of the open living, dining and kitchen area in the new 800 sf ADU
Finished

West Los Angeles · 90064

Maxed-out house + 800 sf ADU over a garage

We designed a second-story addition and a full modern redesign that took the main house to its maximum allowed size, then added an 800 sf state-bonus detached ADU on top of a new garage. More living space for the family and a private rental unit, on a standard city lot.

South Los Angeles
Permitted

South Los Angeles · 90037

Old garage and storage → two ADUs

On a duplex lot, we converted an existing detached garage and storage building into two separate ADUs (about 646 sf total). No new footprint and no new parking required: the work stayed inside buildings that were already there.

Long Beach
Finished

Long Beach · 90807

Small addition + 1,200 sf detached ADU

A modest addition to the existing house and a new 1,200 sf backyard ADU, adding a full second home to the property under Long Beach's ADU rules.

Client reviews

What our clients say

5.0 on HomeAdvisor / Angi · Read the reviews

"Behzad is simply the best. Highly recommended."

Afshin Z. · Tarzana

"For me what stood out was him giving us his expert opinion in what we should or shouldn't do in order to maximize returns."

Shahab Z. · Los Angeles

"I'm really satisfied with them."

Sharlot A. · Los Angeles
Typical 5,500 sf LA lot

What can I add to my lot?

Most single-family lots in Los Angeles can hold more than one home. The usual combinations:

  1. Garage conversionThe existing garage becomes an ADU. No new footprint.
  2. Backyard ADUA new detached ADU up to 800 sf, guaranteed by state law.
  3. JADU inside the houseUp to 500 sf carved out of the existing home.
  4. Bonus attached ADUMax out the house, then add 850–1,000 sf that floor-area limits can't block.
Do it the right way

Why an unpermitted garage conversion costs more

Skipping permits looks cheaper up front and usually is not.

The four ways it catches up with you
City orders and finesCode enforcement can order the work removed or brought up to code, with penalties and inspection fees.
Rent and tenant problemsRenting an illegal unit makes rent harder to collect and a tenancy harder to end.
Insurance and safetyInsurers may deny claims, and unchecked wiring, gas and exits put people at risk.
Selling and refinancingAppraisers and lenders usually don't count unpermitted space, and buyers discount it.

Already have an unpermitted unit built before 2020? State law (AB 2533) makes legalizing it easier. Learn how.

What you actually get

A complete permit set, ready for plan check

Not a builder: what we hand you is the set your contractor builds from and the city stamps.

Zoning and floor-area calculations from a permit set
Zoning & floor-area mathLot area, zone, allowable RFA and which bonus applies.
Existing and proposed site plan
Site plan, existing & proposedSetbacks, parking and exactly what changes on the lot.
Demolition plan and proposed ADU floor plan
Demo & floor plansWhat comes out, what goes in, and every dimension.
Elevations and sections from a permitted ADU set
Elevations & sectionsEvery side of the building, with heights.
Foundation plan and roof framing plan
Structural plansFoundation and framing, stamped by a licensed civil engineer.
Proposed floor plan for a garage conversion and addition
The whole house when it mattersWhen the unit ties into the house, we draw the house too.
How it works

From first call to permit

  1. ConsultationWe review your lot, zoning and goals and show you every bonus you qualify for.
  2. Survey & designWe measure the property and design the layout with you.
  3. Engineering & submittalPlans engineered and stamped by a licensed civil engineer, then submitted.
  4. Plan check to permitWe handle corrections until your permit is ready to issue.
Questions

Frequently asked questions

Is adding an ADU a big, messy construction project?

Usually much less than people expect. A garage conversion reuses the existing walls, roof and foundation, so most of the work happens inside one small building. A JADU is built inside your house. Even a new backyard ADU is a small, one-building project that doesn't touch your main house.

How long does it take to get permits?

State law gives the city 15 business days to confirm your application is complete and 60 days to approve a complete ADU application. We prepare clean, complete plans so you move through plan check quickly.

What does it cost to start?

Garage conversion plans start at $5,000. Other projects are quoted after we look at your lot. Consultations start at $150 and are credited toward your design fee if you start within 30 days.

Why not just convert the garage without permits?

Unpermitted units can lead to city orders to remove the work, fines, problems collecting rent, insurance claims being denied, and trouble when you sell or refinance. Permitted ADUs add legal, appraisable value.

Do you build the ADU too?

We design, engineer and permit your project, then offer construction management and refer you to licensed contractors we trust.

Do you speak Farsi?

Yes. Consultations are available in English and Farsi.

More answers in our ADU guide and ADU incentives pages.

Contact

Book a consultation or ask a question

A one-on-one review of your property and the bonuses you qualify for. From $150, credited toward your design fee if you start within 30 days.

Have a quick question? Send it with the form and we'll get back to you.

Call or text (310) 754-0898
Email aduusa26@gmail.com

Consultations available in English and Farsi.